2011-2017

In the Russian market, "KomplektEnergo" is a representative of VITKOVICE Power Engineering a.s. (The Czech Republic), the leading European manufacturer of power equipment, which enters into machine-building holding VITKOVICE Machinery Group.

Being an indicator of quality and reliability, equipment manufactured by VITKOVICE Power Engineering (VPE) operates at Russian and foreign power plants.
Within the frame work of implementation of the program of Rosenergoatom Concern concerning replacement of copper-bearing equipment, "KomplektEnergo" and VITKOVICE Power Engineering carry out modernization of low and high pressure preheaters (PND and PVD) at the Russian NPPs.

                                 High-Pressure Preheaters

2013
Kalinin NPP: Unit No.1
Manufacture and delivery of four stainless steel high pressure preheaters of chamber type (PVD-K).

2014
Kalinin NPP: Unit No.2
Manufacture and delivery of fourstainless steel high pressure preheaters.                                                                     

                                 Low-Pressure Preheaters

2011
Kalinin NPP: Unit No.2
Manufacture and delivery of PN -3000 stainless steel pipe system.
Rostov NPP: Unit No.1
Manufacture and delivery of twoPN -3000 stainless steel pipe systems.

2012
Kalinin NPP: Unit No.1 andUnit No. 2
Manufacture and delivery of five PN -1200 pipe systems with stainless steel pipes.
Balakovo NPP: Unit No.1
Manufacture and delivery of five PN -1200 stainless steel pipe systems.

2013
Kalinin NPP: Unit No.1 and Unit No.2
Manufacture and delivery of five PN -1200 pipe systems with stainless steel pipes.

2014-2015
Rostov NPP: Unit No.4
Manufacture and delivery of Low Pressure Preheater assembled, the set consists of five PND-1200, two PND-3000 and two condensate coolers (OKG).

2015
Balakovo NPP
Manufacture and delivery of two PN -3000 stainless steel pipe systems.

2015
Balakovo NPP: Unit No. 3
Manufacture and delivery of five PN -1200 pipe systems with stainless steel pipes.

2016-2017
Balakovo NPP
Manufacture and delivery of five PN -1200 pipe systems with stainless steel pipes.

Project gallery
Partners READ MORE
  • ОАО «Турбоатом» (Украина)
  • Taprogge GmbH (Германия)
  • VITKOVICE Power Engineering a.s. (Чехия)
  • Sigma DIZ spol. s r.o.
  • ICL Industrial Products (США)
  • Elpanneteknik (Швеция)
  • ОАО «ОКБМ им. Африкантова»
  • ОАО «НПО ЦКТИ им. И.И. Ползунова»
  • ОАО «ВНИИАМ»
  • ФГУП ВО «Безопасность»:
  • EUROTUBE GmbH (Германия)
  • Центравис (Украина)
  • ОАО «Концерн Росэнергоатом»
  • ОАО «Атомэнергоремонт»
  • ООО «Битруб Интернэшнл»
  • Fischer group (Германия)
  • ThyssenKrupp Mannex GmbH (Германия)
  • Aermec S.p.a. (Италия)
  • ГНЦ РФ ОАО НПО «ЦНИИТМАШ»
  • ОАО «НПО «ЭЛСИБ»